home | downloads | location | news | archive | faq's | links | contact
 
 
 
 

Sub Navigation

• About Mackay Port
• Access & Planning
• Prill Sulfur


Main Page > FAQ's
Frequently Asked Questions

About the Mackay Port Authority

Who owns the Mackay Port Authority?
The Mackay Port Authority is a statutory model Government Owned Corporation (GOC) with two shareholders—
(1) the Treasurer of Queensland, and
(2) the Minister for Transport.
The current face value of the issued share capital is $139,208,804 (combined airport and seaport).


What area is owned by the Mackay Port Authority or is under its jurisdiction?
The Authority owns (freehold) about 150 hectares at the Mackay Airport. At the seaport, it controls about 800 hectares, most of which is now freehold. It also holds leases over the seabed within the harbour walls.


What are the boundaries of the Mackay Port Authority?
See the latest version of the Land Use Plan.


Is the Mackay Port Authority a government body employing public servants?
The Authority is not part of the Queensland Government but is merely a wholly owned entity. It does not employ any public servants.


Is the Mackay Port Authority completely funded by the government?
The Authority is not funded by Government. Apart from its early repayable loans, it never has been funded by Government. Nor has it been funded by ratepayers.


What is the relationship between the Mackay Port Authority and the Mackay City Council-who looks after what?
The Port Authority, under the recent Integrated Planning Act, is now in effect the local authority for planning and building purposes within its port lands. (Previously, it was exempt from Council planning schemes but was required to seek Council building approval.) All lands controlled by the port authority are port lands (airport and seaport).

But the Council has certain responsibilities that do extend into port lands; and in certain circumstances the Council levies rates on some parts of those lands.


How do Port Binnli and the marina fit in with the Port Authority? Is the Port Authority responsible for the marina and surrounding developments??
The segregation of small-craft operations from commercial shipping, and the associated segregation of public traffic from heavy trucks and trains within the port, were key strategies developed in the 1992 Port Development Plan.

As the Authority had no desire to own or manage a small-craft harbour, it agreed with the shareholders that the ownership and ongoing management of the marina would be offered to the private sector. That open public offer, made in 1994/95/96, resulted in the selection committee's recommendion to Cabinet that Port Binnli's proposal be accepted. Cabinet adopted that recommendation. Port Binnli Pty Ltd entered into contractual arrangements with the Mackay Port Authority, and the MPA entered into similar arrangements with the State Government to ensure that the project fulfilled all requirements.

The Port Authority owns the breakwater, the seabed within the marina, and the public pedestrian esplanade along the waterfront. The seabed and the esplanade are leased to Port Binnli, which is required to keep the esplanade in good repair and maintain public access.

Apart from the boat ramp carpark, which reverts to Queensland Transport, the remainder of the land within the marina development becomes freehold. When the developments reach the specified milestones, the titles to the freehold parcels will pass from the State to the MPA and then to Port Binnli.


What area does the seaport actually own?
Although about half of the port area used to be Reserve, in effect all of our land will soon become freehold and thus be 'owned' by the MPA. At the airport this process has been completed. It affects about 150ha; at the seaport, the area will ultimately be nearly 800ha


Are the seaport and the airport both controlled by the MPA?
Yes, but under slightly different legislation.


What does the Mackay Port Authority workforce do?
Its role is to ensure the ongoing operational status of both the seaport and the airport, and to continue to meet users' needs. In addition, the MPA must act at all times in the best interests of the shareholders.


What is it like to work for the Mackay Port Authority?
All positions offered at the MPA are keenly contested, clearly indicating that the community regards the MPA as a leading regional organisation that rewards its employees.


How deep is the harbour?
The harbour is dredged to a theoretical depth of 8.5m below low water line. So there should never be less than 8.5m available to shipping in the designated harbour areas. Because of the large tidal range of up to 6.5m, navigable depths up to 15m are available to permit the arrival and departure of deep-draught vessels.


Access and Planning

What will happen about public access to North Wall?
The new northern access road will allow vehicular access to the northwall beach without interfering with trucks carrying cargo from wharf #5. But once the prill sulphur terminal becomes a reality, public access will have to be denied from time to time in the interest of safety.


Is it true that the port and its breakwaters will be closed to the public? If so, when, where, and why?
The port development plan recognised that the growing safety concerns would necessitate increasing periods during which the northern wall would have to be closed if the Authority is to meet its legal safety obligations under Workplace Health and Safety (WH&S;) legislation.

So, to provide some offset to that growing restriction, and as part of the new southern breakwater construction, the MPA has developed the new road along the crest of that new wall and installed street lighting to provide access at all hours to the full length of that wall.

This commitment provides a fair balance. The public are able to fish and observe the port operations safely without interfering with those operations.


Is the new breakwater functioning as designed?
Yes. The design of the wall was modelled on the long-term stable profile adopted for the original breakwater.

Although not readily observable in the new area, that profile is a stepped outer slope. The excess material extracted to form the new small-craft harbour entrance was placed on top of the wall as extra reinforcement.

What was not apparent until that excavation took place was that the material extracted from the original breakwater was extremely variable in size and generally much smaller than the construction drawings indicated. Some very large rocks, however, were encountered near the base of the excavation.

As a result, heavy seas often move the overlying layer and either throw it onto the road or erode it. But this process does not affect the structural stability of the underlying wall.


Where can I fish?
Port Regulations have always banned fishing from the wharves, and the northern wall is generally closed.

Traditionally, some leniency has been allowed when operational requirements permit. No restrictions apply to the southern breakwater at any time.


Can we still use the boat ramp in the harbour?
No. The boat ramp is now to be used as a barge ramp. All small-craft operations will be relocated to the new boat-launching facility in the marina.


Will the surf beach always be there, and will it always be accessible by the public?
The short- and medium-term projections for the port do not indicate any effect on the current north wall alignment.

The long-term projected needs, however, anticipate reclamation along the beach to the north by about half a kilometre, enclosed by a new north wall. The ultimate development would allow ships larger than Panamax to berth at the projected outer harbour wharves; and container shipping could be established.

As outlined in an earlier comment, at some future time WH&S; issues associated with mixing public access with port operations will require beach access to be relocated. The Authority is working with the Slade Point Natural Resources Committee to develop future beach access from the northern end of the Slade Point Industrial Estate.

This development would also serve as the southern access to the Reserve and the northern access to proposed boardwalks through the Authority's conservation areas, particularly the melaleuca forest. In short, there will always be access to the beach, although the location of that access may change over time.


How much of the Port Authority's land will be developed, and how much will be reserved for conservation or buffer areas?
The Authority has undertaken to conserve over 25 per cent of its seaport land holdings permanently-substantially more than any comparable port does. The remainder of its land will be considered for development to meet demands. In addition, owing to the high cost of raising much of the future port land to building level, it will also seek to take economic advantage of opportunities to use material dredged to deepen the harbour.


What is planned for the western side of Slade Point Road?
Significant areas west of Slade Point Road are included in the conservation areas, but substantial areas are either of little environmental value or have been degraded by past uses. These degraded areas will be considered for development as previously mentioned.


Does the port have a scheme to remove any mangroves, melaleucas, etc. and replant?
When port needs unavoidably affect the environment, 'environmental banking' is regarded as the optimal solution. Under that concept, any significant habitat destruction would be compensated for either by rehabilitating an agreed area of damaged land elsewhere (perhaps not in the port area) or by creating a new, equivalent environment.


Is the quarry still operational?
The quarry is considered an ongoing operational asset of the port. Although originally the small-craft harbour project was expected to use up the rock extracted from the quarry, it was subsequently proved to be capable of providing for the small-craft harbour and to have the potential to produce up to a further five million tonnes. The Authority, therefore, will continue to retain the quarry licence and will carefully manage the quarry and adjacent uses to allow its future operation.


When is the pier to be moved or dismantled?
With the current relocation of the acid pipeline, no operational requirement now justifies retaining the pier. The Authority is committed to removing the pier during the next three years; the Board has clearly directed that the demolition work begin as soon as possible.
Ian Meech is studying the best way to carry out the demolition.


Who controls ship unloading and product delivery?
The harbourmaster controls navigation within the port. The Port Authority is responsible for providing and allocating facilities in the port. The stevedores or terminal operators are responsible for loading and unloading and for transporting products to and from terminals.
The only element of loading and unloading controlled by the Authority is the wharf crane on wharf #5—a crane operated by stevedoring personnel.


Why do people have to pay Landing Tax at Mackay airport only—not at other airports?
Passenger head tax is levied by many airports, but usually not at major airports where other sources of revenue fund the operation and maintenance of passenger terminals etc. For example, at international airports, major revenues are derived from shopping (particularly duty free), and from parking charges, which combine to obviate the need for any passenger charge.


When and why are we filling in Bedford’s paddock?
See earlier comments on the area west of Slade Point Road.


About Prill Sulphur

What is prill sulphur and what is it used for?
Sulphur is used for a wide range of products. The Mackay proposal relates to the Marlborough Nickel Project, which involves a laterite deposit about 20km south of Marlborough. The project has not yet been approved and still has both economic and environmental hurdles to overcome.

Recovering the nickel requires the production and consumption of substantial quantities of sulphuric acid, and continual importing of about one thousand tonnes of sulphur per day.
Prill sulphur is a specially produced form of sulphur that eliminates the major handling difficulties. It comprises molten sulphur cooled into pellets one to two millimetres in diameter. The result is a uniform, almost odourless product, that is easy to handle, that will flow easily through chutes and onto conveyors, and that does not easily degrade. Dust problems are thus avoided.


Is it corrosive?
Dust produced by inappropriate handling can dissolve in water and become corrosive. The appropriate management practices, therefore, are all intended to prevent the degradation of the prill sulphur.


Where will the sulphur plant be constructed?
There will be no sulphur plant at the port. We will merely have a storage terminal (north of the grain terminal on the north frontage of the new northern access road) that will receive sulphur by truck from ships at wharf #5 and that will stockpile the material under a roof until dispatch. For dispatch, the product will be fed onto a conveyor leading to a rail loading facility next to the storage terminal.


How will the sulphur be stored?
It will be stored within concrete walls on an AC-paved floor under a ventilated roof.


Is the prill sulphur safe? What happens when it gets crushed or wet and then blown about?
Yes, it is safe provided appropriate handling standards are met. As previously explained, it is essential to adopt processes that avoid degrading the product from prill form into powder or dust.


Will the prill sulphur have an odour?
No—see previous comments.


Will the public get an opportunity to oppose the prill sulphur plant if the environmental assessment authorities approve it?
Public comments, an integral part of environmental assessments, must be given due consideration by the approving agencies. At the end of that process, if the project obtains all required approvals, it would be expected to proceed.


Should local residents be concerned about health risks associated with prill sulphur?
No - it is unfortunate that political agendas have inflamed public concerns to unjustified levels.
The normal Environmental Impact Study (EIS), begun in 1998, would have addressed these issues in due course. But the timeframe for completing that process is beyond the MPA’s control and has been progressively extended owing to financing delays.

The Authority has responded to these community concerns by accelerating its assessment of its requirements. The process entailed considerable expense in undertaking a fact-finding inspection at Vancouver in April 2001 to identify and understand the appropriate management practices for avoiding environmental impacts.


About Mulherin Park

Will the old Mulherin Park stay open?
The old JM Mulherin Memorial Park will be retained until 2005. By that time it is expected that Mackay people will accept as a substitute the new Mulherin Park, comprising stage 1 (completed in 2000) and stage 2 (to be completed by MCC in 2001-02). So the Authority will progressively review options for alternative uses of the old park to complement the marina development and also to provide an appropriate transition of land use to protect the fuel terminal operations along Hamilton Drive.


How long will it be maintained? What will it be replaced by?
See previous answer.


Why doesn’t the Port Authority provide more facilities in the new park area?
As the new park is the responsibility of Mackay City Council, that agency will determine what facilities will be provided.


Who owns the new park? When will it be extended? Will there be more car parks?
Mackay City Council owns the park. See previous comments on Stage 2 timing and facilities.


Will there be better facilities (such as toilets) in the new park?
By arrangement between MCC and the Mackay Surf Life Saving Club, the new park already incorporates public toilets at its northern end. The planned stage 2 at the southern end will incorporate additional toilet facilities.


How can the Port Authority close a ratepayer-funded park?
The old JM Mulherin Park was funded directly by the Mackay Harbour Board from its own funds, none of which came from ratepayers.


How much land is reserved for environmental improvement?
See previous comments on conservation areas. More than 25 per cent of the land is permanently preserved for conservation.


Is there an MPA code of conduct for its tenants?
All tenants are obligated by law and through standard lease clauses to comply with all environmental standards. Many operations specifically require environmental licences that require rigorous standards to be maintained.



top of page contact | feedback | sitemap | disclaimer | credits
©copyright 2002 - 2004 Mackay Port Authority